Three Drill Rigs On Site


Three Drill Rigs On Site

Three drill rigs are now working 24/7 on the Florence Copper property to install injection and recovery wells, monitoring wells, and replacement irrigation wells.

During November, crews installed and cemented a 36-inch diameter pipe as part of the surface casing installation process.

In addition, the crews have staged 14-inch spiral-welded steel casing, which will be installed in the coming weeks. This casing, also known as conductor casing, will extend to approximately 500 feet below the ground.

Back to the blog index